New construction roofing has its own timeline pressures and code requirements — our Roof Installation crews coordinate directly with builders to keep Adger projects on schedule.


We maintain open communication with Adger building inspectors' offices to understand current local interpretation of Adger, AL code requirements.
We also provide builders with a clear timeline upfront, so Roof Installation scheduling can be built into the overall project plan with confidence.
Every Roof Installation crew lead carries current Adger, AL licensing for new construction work.
We slot into tight Adger build schedules without needing weeks of lead time.
No change orders sprung on a build schedule without prior discussion.
We stay current on Adger, AL code updates so inspections pass the first time.
Most new Adger builds combine two or three of these elements depending on the architectural plans.
We prioritize dry-in scheduling to keep your build on track for interior work to begin.
Shingle installation follows manufacturer spec and current Adger, AL code for nail pattern and exposure.
For Adger builds specifying metal roofing, our crews fabricate and install panels to exact plan dimensions.
Proper ventilation gets built in from the start on new construction, not retrofitted after the fact.
Before the final building inspection, we walk the roof to confirm everything meets Adger, AL code requirements.
All flashing points — valleys, chimneys, vent penetrations — are installed correctly the first time on new builds, avoiding costly callback repairs.

Call +1-855-469-0306 to coordinate scheduling — dispatch connects you with a Roof Installation project lead.
A crew lead reviews plans and coordinates arrival timing with your build schedule.
Builder-specific requirements are confirmed in writing before work begins.
Pre-inspection walkthroughs happen before your official Adger building inspection.

Our GC said they were easier to coordinate with than most subcontractors on the project.
— Adger Homeowner
They flagged a decking issue early enough that it didn't delay the timeline.
— Adger Homeowner
Communicated clearly with our project manager throughout the whole build.
— Adger Homeowner
They kept us posted every time a weather delay pushed the schedule back a day.
— Adger Homeowner

We keep material suppliers on standby so a Adger build isn't stalled by a single delayed shipment.
